Our projects

Our recent projects are mainly large bridges, highways, airports. However, this direction of work is not considered as our only priority. We are interested in cooperation on any new object regardless of its scale and complexity of geological conditions or the uniqueness of design solutions. We are equally attentive to our work, even if it is a small private house project.

Our conclusions and recommendations always contain the most complete information about the composition and condition of the soils of the foundation. We always offer professional and sound solutions to optimize the project.

Dear Customers, you can address us all kinds of questions concerning geological engineering surveys, geodetic engineering surveys and control of construction quality.

We will be glad to work with you regardless of scale and cost of your project.

The highway of state importance  M-01 Kyiv-Chernihiv.  KM 18-KM 98. Transport interchanges, pedestrian crossings, bridges, retaining walls, overpasses.

(Geological engineering surveys. Inspection of the road section, determination of the pavement structure, modulus of elasticity, studies by Proctor method. Drilling works. Soil research using  CPT, DCPI methods. Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).

New construction of wind power plant «TILIGULSKA WIND POWER PLANT» with a capacity of 500 MW in the Mykolaiv region.

(Topographic and geodetic works. Geological  engineering surveys. Drilling works. Cone penetration test. Testing of soils in a geotechnical laboratory. Compilation of a geotechnical report).

Capital repair of the highway of state importance M-05 Kyiv-Odesa and projected artificial structures.

(Geological engineering surveys. Inspection of the road section, determination of the pavement structure, studies by Proctor method. Drilling works on the highway, as well as designed overpasses and bridges. Soil research using CPT, DCPI methods. Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).

Works on capital repair of  the highway M-03 Kiev – Kharkiv – Dovzhansky on the sections: km 300 + 550 – km 323 + 000; km 329 + 050 – km 333 + 250.

(Geological engineering surveys. Inspection of the road section, determination of the pavement structure, studies by Proctor method. Drilling works on the highway, as well as designed overpasses and bridges.  Soil research using  CPT, DCPI methods. Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).

Development of a project for a bridge across the river  Southern Bug in the city of  Mykolaiv.

(Geological engineering surveys.  Drilling works in the water area of the Southern Bug River and onshore. Soil research using SPT, CPT, CBR, DCPI methods. Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).

Bypassing the city of  Zhytomyr.

(Geological engineering surveys. Inspection of the road section, determination of the pavement structure, studies by Proctor method. Drilling works. Soil research using SPT, CPT, CBR, DCPI methods. Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).

Monitoring of landslide hazardous processes within the right bank of

the Southern Bug river. 

(Surface and depth monitoring by methods of geodetic control, depth strain gauges, and surface extensometers. Climatic observations. Forecast of the development of dangerous geological processes. Compilation of a geotechnical report).

Construction of a residential and public complex on I. Bohun street in Vinnytsia.  (Geological engineering surveys.   Studies by Proctor method. Drilling works.  Soil research using  CPT, DCPI methods. Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).

Capital repair of the bridge across the river Velykyi  Utlyuk  at km 445 + 832 of the highway M-18  of national importance Kharkiv – Simferopil – Alushta – Yalta (Zaporizhia region).

(Determination of the pavement structure,  modulus of elasticity, studies by Proctor method. Geological engineering surveys. Drilling works,  Cone penetration tests. Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).

Construction of the Podilsk bridge across the Dnipro river in Kyiv.

(Geological engineering surveys. Drilling works in the water area of the Dnieper river and onshore. Soil research using  CPT method.  Hydrogeological surveys.

Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).

Capital repair of the road overpass across the railway in Nikopol, Dnipropetrovsk region. 

(Geological engineering surveys.  Inspection of the overpass, determination of the foundation construction. Drilling works.  Cone penetration tests.  Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).

The highway of state importance M-14 Odesa – Melitopol – Novoazovsk in the Kherson region. 

(Geological engineering surveys.  Inspection of  the highway section,

determination of the pavement structure,  studies by Proctor method. Drilling works.  Soil research using  CPT method.  Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).

The highway of state importance M-14 Odessa – Melitopol – Novoazovsk in the Mykolaiv region, within the projected approach to the bridge over the Southern Bug river.

(Geological engineering surveys.   Inspection of  the highway section,

determination of the pavement structure,  studies by Proctor method. Drilling works.  Soil research using  SPT, CPT, CBR, DCPI methods.  Soil testing in a geotechnical laboratory, California bearing ratio. Compilation of a geotechnical report).

Capital repair of the highway of state importance H-07 Kyiv-Sumy-Yunakivka of the Chernihiv region and projected artificial structures.

(Geological engineering surveys.    Inspection of  the highway section,

determination of the pavement structure,   modulus of elasticity, standard compaction. Drilling works on the highway, as well as  designed overpasses and bridges. Soil research using  CPT method.  Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).

Construction of a seaport overpass in Chornomorsk.

(Geological engineering surveys.   Drilling works.  Cone penetration tests.  Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).

Reconstruction of Boryspil airport.

(Geological engineering surveys.   Drilling works.  Cone penetration tests.  Determination of the design of the runway and access road. Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).

Reconstruction of the bridge at km 66 + 900 of  the  highway  P-47 Kherson – Nova Kakhovka – Genichesk in the Kherson region.

(Geodetic surveys. Geological engineering surveys. Drilling works, Cone penetration tests. Hydrological surveys. Calculation of general and local erosion. Soil testing in a geotechnical laboratory. Compilation of a geotechnical report).